A. Contract Owner: City of Canton
B. Project Title: Sherrick Road Stabilization
C. Contract Specifics:
1. Prime Contractor: TAB Construction Co, Inc
2. Subcontractor: K.S. Construction Co, Inc
3. Contract Value: $163,009.31
D. Work Description:
K.S. Construction’s portion of the work involved 2,500 LF of excavation and grading for new concrete curb, wheel chair ramp, driveway apron, and sidewalk. catch basin reconstruction, adjusting catch basin & manhole castings to grade, pavement saw cutting, 234 LF of 12 & 15 inch Type B Conduit pipe installation, pouring concrete for roadway stabilization, placing topsoil and seeding, detour signing, and maintaining of traffic.